1 和滑塊干涉的倒勾請加膠填平至滑塊可以平順滑動 The undercut area where interfere with slide block need to be filled material to help the slide can move smoothly The thickening added too thick. The thickening area is too wide. Gate position is moved. The split line of slide block or thearea of slide. This area is hard to be filled due to the sharp feature The strength of this area is too weak and isn’t easy to get cold due to the steel too thin 2 3 4 5 6 7 加膠太多 加膠面積太大 灌點位置移位 滑塊拆的位置 此處有尖角,填充困難 此處鋼材太薄,強度不足而且不容易冷卻 8 圓柱特徵要有一半圓不可以拆在滑塊上,以免粘滑塊造成拉白,拉斷. 此處做斜銷在作動時會破壞到成品 這個面是裝配面,不能加膠 此處料位太厚,會有縮水,建議減小塑料厚度以改善 The semicircle of cylinder avoids designing on slide block lest it will be pulled apart or cause drag mark. The part will be damaged if we make lifter in this area. This is critical surface where is not allow to add material. This thick wall area might because sink mark,Please reduce some wall thickness to improve it. Please confirm whether it is acceptable to has Slide split line if we have slide in this area. Please confirm whether it is critical surface or not? Please confirm whether we can reduce material to the area where have undercut as indicated to have shut off on core and cavity side. No slide block and lifter to be made. Please confirm these questionsasap. Otherwise the lead-time will be extended. The trim mark of the gate is not visual after open the top case if the gate position isdesigned like it We would suggest to enlarging draft to help tool released. If you insist that the gate position have to be 9 10 11 12 13 14 此處做滑塊的話會有結合線,請確認是否可以接受 請確認此面是不是外觀面? 此處有倒勾,能否減料,使公母模靠破,不做滑塊和斜銷 15 16 請盡快確認這問題點,否則會影響交期 Gate做在此處的話.蓋子打開後看不到Gate的修剪部位 加大拔模角,以便脫模順利 如果GATE一定要做在你們指定17 18 - -可修编.
- .
的位置的話,那還不如做在這一側,這樣的話還可以減小這個位置的縮水 asoriginal design then we would further remend to have it to the area where indicate as it can avoid shrink problem in this area. 19 P.L面開在此處,模具上會有尖角There are sharp edges if set the parting line at 和刀口,對模具壽命有影響 here, It will reduce the tool life 請問此產品的面是否為外觀面?表面做什麼處理?是蝕紋/拋光? 請問產品這個面可否加頂針或頂塊?產品允許加扁頂針嗎? 這個產品的柱位元我們打算做司筒。(或鑲針)可以嗎? 這個位置有倒勾不能脫模,我們打算做滑塊,在此面上會有分模線,你接受嗎? Can you tell me whether the surface of this part is a visible/esthetic one? What will we do for its surface? Texture or Polishing? Does this part need an ejector pin or an ejector bar? Can we add an ejector blade? Can we add ejector sleeves or ejector pins in the boss of this part? There's an undercut at this position and it needs a slider. It will also have a parting line on this side, is that OK? We will make the lifter or innerslider in this position, will that be a problem? 20 21 22 23 24 25 26 我們打算在這個位置做斜頂或內滑塊,有問題嗎? 你提供的2D產品圖與3D產品圖The 2D and 3D drawing you provided is not the 不一致,請問以哪一個圖正確? same, can you tell me which one is correct? 你提供的3D產品圖有的地方沒有脫模角,有的地方膠位太厚,有的地方膠位元太薄,這些產品問題我們可以自己修改嗎?修改後會給交給你確認。 按你們提供的縮水率千分之五,這個模具的尺寸已經做到了模具圖面要求。 注塑出來的產品不符合你們的產品圖。請確認你們的材料的縮水率是否正確? 產品的這個位置太小,導致模具鋼料太薄,能夠加寬這個位置嗎? There is no draft angle in the 3D drawing, some materials are too thick, and some place are too thin. Can we modify this part by ourselves? We will send the drawing to you for you to check after we modify it. According to the shrinkage one over two hundred, the mold has been done in the right dimension, The part falls short to your part drawing, are you sure the shrinkage is right? This position is too small and will make the steel material here too thin, can we widen it here? 27 28 29 30 斜頂與後面的Boss空間太小,斜The angular lifter interferes with the boss during 頂在運動時會干涉到柱子,能移ejection. Please consider changing the position of 動這個柱子的位置嗎? the boss. 這個筋骨位膠厚太薄,而且高度The rib here is too thin and on the high side, so it 31 - -可修编.
- .
偏高,注塑時很難填充這個筋位,可以增加這個筋骨位的厚度嗎? 32 你是想將此筋骨位的高度加高/減低嗎?假如加膠,我們將用放電方式加深。 減膠修改有兩種做法, 1、做鑲件; 2、燒焊;因為鑲件的底部有運水,我們簡單的做法是燒焊處理,你可以接受嗎? 34 這個樣板的筋骨位底部燒焦,是因為排氣不良,我們可以在筋骨位的中間增加一個鑲件。 重做鑲件大約需要5-6天時間 產品的這個面我們已經做了曬紋處理,如果需要加膠,這個面我們需要重新外發曬紋。可能需要幾天的時間。所以我們直接以銅公放電的火花紋取代你要求的紋路,你可以接受嗎? 37 38 39 模具是用公制/英制的配件? 需要備用件嗎? 模具上銘牌上的刻字內容是由你們提供嗎?你們什麼時候可以這些刻字資料。 will be difficult to fill here when we do the injection, can you increase the thickness of this rib? Will you increase/decrease the material on this rib? If add the material,We willmodify it with EDM process There are two option if decrease the material: 1.Make inserts; 2.Welding, because there is water in the bottom of the insert, is that OK? This sample has been burned in the bottom because the venting is not good, we can add an insert in the middle of the rib. It will take about 5 or 6 days to redo the insert We have made the texture on this side, if we add material, it will take some days to remake the texture by out-resourcing, so we suggest using the texture by EDM instead, is that OK? 33 35 36 Is this mold dimension measured in inches or meters? Does it need spare parts? Will you provide the engraving content of the plate of this mold to us? When will you send it? 40 可否提供此模具生產時,注塑機Can you provide the type of injection machine and 的型號及相關資料。如:啤機大other related information of this mold to us? Such 小、呵林柱尺寸、頂棍孔尺寸等 as the boss dimension, the hole's dimension of the ejector pin and the size of the injection machine and so on. 41 42 43 這個問題我需要同其他同事商議會再答復你。 我們將盡力達成你的計畫,如有異常,會及時通知你。 這個產品的長度為330.12MM,寬度為78.96MM,高度為45MM.膠I need to discuss this problem with the other colleagues and then I will reply back to you. We will try our best to plete your plan, if there are any plications, we will notify you immediately. The length of this part is 330.12MM, Width is 78.96MM, height is 45MM, thickness is 2MM, - -可修编.
- .
厚為2MM,重量為70.63g, 44 weight is 70.63g, 試模注塑機型號為250噸,膠料顏The injection machine is 250T,the material is black, 色為黑色,產品外表面曬紋處理,the outside of the part has texture, inner side 內表面為拋光. needs polishing, 和滑塊干涉的倒勾請加膠填平至滑塊可以順利滑動 此面是否有特殊要求,能否有頂針痕 The undercut area interferes with the slide block and needs to be filled with material to help the slider move smoothly. Please confirm whether it is a critical surface or not and if we can have E.J. pin marks on it. 45 46 47 此處Gate做潛伏市灌頂針的話,If the design of the gate has to be a sub. Gate, then 背後的外觀面會有沖料痕,而the back surface of the part will have serious flow 且成品又是黑色的,會最明顯 marks due to the black color. 48 P.L開在此處不合理,模具加工困This area is not suitable to have a Parting line 難,P.L應改為和圖示的一樣 because the tool will bee more plicated; therefore, we remend to have the Parting line as indicated. 產品粘母模的機會很大,能否在公模加倒勾,拉料頂針或者公模保留E.D.M紋,開模時使成品留在公模一側 此處料厚段差很大,成品表面會有應力痕,是否接受 請注明何處為外觀面,能否提供2D圖和注意事項 紅色所示處是有問題的地方,請特別注意 成品設計此處有問題,建議如下圖所示修改 此處改為一個球形的凹槽 此處大滑塊上走小滑塊,小滑塊要先退,大滑塊要做延遲 滑塊要用液壓油缸抽芯以保証開合模順序 這個面有裝配,加料的話裝配時會頂住,如圖所示 There is possible sticking on cavity; therefore, please confirm whether it can make undercuts, snatch pins or leave coarse E.D.M. on the core to snatch the part on Please confirm whether it is acceptable to have stress lines on the surface because the thickness is not equal. Please advise where the critical surface is. Please also provide us a 2D drawing with critical dimensions. Please note the red highlights because those areas have problems. We would suggest using the attached part design as the current design has problems. We suggest modifying it as a globe recess. The inside small slide block will recede first and the parent slide block have to postpone sliding. The slide pins will use an oil cylinder to assure that the process is in proper order. We cannot add material to this surface because it will intervene between the two parts when it is assembled. 49 50 51 52 53 54 55 56 57 - -可修编.
- .
Please see the sketch attached. 58 59 60 可降低斜銷面,增加成品些許肉厚來做變化 一半做斜銷,一半做自然 此處兩個柱子重疊,有倒勾,不能做自然,要做SLIDE 此處強迫頂出 公模兩段開模,這個地方先退 To descend the surface of lifter in order to thicken the part. One half side will have the lifter and the other half will be solid/nature. These two bosses are overlapping with undercut therefore it can not be made as solid. We suggest making it with a slide block. This area needs force ejection. Here will be a double ejection for forward and receding. 63 64 此處做鑲件會有夾線,能否接受 Please confirm whether it is acceptable that there will be a split line here. 此面公母模1度靠破,會有段差,可否接受 這個尺寸能否加大 此處加一個凹槽,膠片的彈出效果會更好一些,試模後看裝配的效果再做修正 67 此處有倒勾,建議將剖面線所示部位CUT即可避免此處的倒勾 成型後SUB GATE要修平 此處倒勾先垂直頂出,之後再手動取出 處改不到 71 72 Please confirm whether it is ok to have mismatch to the area where there is 1 degree of shut off in Core / Cavity side. Please confirm whether we can enlarge this dimension. It will affect the elastic of the film better if we add a recess. See how it will affect the assembly parts, and then make your decision. There is an undercut here, we suggest cutting out the indicated part as it highlighted to avoid an undercut. The gate (sub gate) needs to be trimmed evenly after being moulded. This area of the undercut needs to be ejected vertically, then taken out manually. are two sliding blocks sealing off this area. 61 62 65 66 68 69 70 這兩個面都有滑塊,GATE改在此The gate is not suitable in this area becuase there 此處加做一個旋轉GATE,射出時We would suggest placing a runner shut-off insert 方便調整成品的品質 to adjust the volume of part filling. 此倒勾在滑塊上強迫脫模,倒勾是否可以減小到0.6 此柱子無法脫模,請確認是否是在轉圖時錯位,能否提供客戶的This undercut will be force ejected out, Please confirm whether it can be reduced to 0.6 mm. This boss is not releasable. Please check the file again and if possible, pleas re-send us the original 73 - -可修编.
- .
原始圖檔 data. 74 75 此柱子是實心的,會縮水 這個面是否要咬花,咬花番號是什麼,最小的拔模角要多大 draft. This boss will shrink because it is a solid boss. Please confirm whether this surface needs to be textured or not. Please advise texture specs. Also, what's the min. draft. 76 77 這個面是否要打光,貼標簽 Please confirm whether this surface needs to be polished and stuck on a sticker. 紅色顯示的幾個面拔模角太小,The red highlighted area has a problem of a small 出模時會拉傷,建議加大拔模角 draft angle. We suggest enlarging the draft to avoid casuing drag marks on the part. 此RIB太薄,會填充不足 此RIB太厚,會縮水 此處倒勾出模困難,建議先不做倒勾,成型後再二次加工,但要做治具,費用要另外算 柱子底部都要做火山口 This rib can not be filled properly because it is too thin. This rib will have a shrink problem because it is too thick. There are problems with this current design, we remend doing this undercut as an alternative but there will be additional costs. The base of all bosses require a crater to avoid shrinkage. 78 79 80 81 82 鑲件,P.L.面有充足排氣坑,P.L.Insert/PL should have adequate venting,PL should 面要開環形排氣槽,並能將氣體have around slot for venting. 排到模外。 頂棍孔鑲件端面距離底板面0,5mm,攻m20牙 排氣槽距封膠位10-15mm 底面板均要有隔熱板,DME規格1/4厚 此處有進膠及方頂,所以無法在此處加水路 進膠點改成在方頂裏做潛水的形式,方頂具體位置需要模流分析後確定。此種進膠方式削除較困難,會有殘餘(表面不平或高或the surface of KO insert shound below bottom plate 0.5mm,thread M20. Venting slot distance from the seal off position 10-15mm Top/Bottom plate must have insulator plate,DME standard 1/4'H This area has runner & square ejects then can not set up cooling system Change to one sub-gate/ square gate(1.2x4mm). After the mold flow analysis, xxx will advise where to set gate location. This gate may hard to remove the runner. It also may has shadow on 83 84 85 86 87 - -可修编.
- .
低),而且產品表面壓力大後很容易有陰影。) 88 依照客戶產品原有拔模角度產品會沾母模,所以我們建議此處分模線需要改在上面 為防止滑塊黏母模,產品此處R不能出在滑塊上(請參考我們的初步3d拆模) 能否往箭頭方向移動1mm?
the surface. Above will serious affect the texture & cosmetics To prevent from part stick on cavity side, MGF advise the PL change to this location 89 To prevent from scrape, the slide can not cover the radius(xxx has 3D file for reference) Can this stage move 1 mm as the Pink arrowdirection? 90 DFM常用中英文对照
1、这个红色面在前模方向/后模方向/行位方向有倒扣。
This red surface is undercut at cavity side / core side / slider side. 2、这些红色面在前模方向/后模方向/行位方向有倒扣。
These red surfaces are undercut at cavity side / core side / slider side.
3、产品的这个位置太小,导致模具在前模方向/后模方向/行位方向有薄钢位。 This position is too small and it will bring the thin steel at cavity side / core side / slider side. 4、这些红色线是前后模/镶件/行位/斜顶分型线。
These red lines are the parting line of cavity and core / insert / slider / lifter. 5、此产品使用推板/推块顶出。
Use the stripper plate / ejector block to eject this part. 6、前模/后模斜行位。
Inner angle slider at cavity / core side.
7、为了简化模具结构建议改变此处出模方向。
Suggest to change the draft direction of this position to make the mold structure simply. 8、最终的进胶位置根据模流分析。
Finally gate position according the mold flow analysis.
9、斜顶与后面的柱位空间太小,斜顶在运动时会干涉到柱子,请考虑移动这个柱子的位置。
This lifter intervene with the pole during ejection, please consider changing the position of the pole.
10、此处有薄钢位,强度不足而且不容易冷却。
The strength of this area is too weak and it is hard to cool because the thin steel. 11、此处有尖角,填充困难。
- -可修编.
- .
It is hard to fill for this area because the sharp feature.
12、此处料位太厚,会有缩水,建议减胶改善。
We suggest to reduce some wall thickness to avoid the sink mark for this position. 13、此处的行位夹线在外观面上,请确认是否接受?
Please confirm whether it is acceptable to have a slider line on the visible surface?
14、建议加大拔模角,以便脱模顺利。
We suggest to enlarge the draft angle to help release the tool.
15、如果分型面此处,模具上会有尖角和刀口,对模具寿命有影响。 There are sharp edges if we set the parting line here, it will reduce the tool life. 16、此处料厚段差很大,成品表面会有应力痕,建议修改如图示。
The thickness is not equal and it will bring the stress lines on the surface, suggest to improve the part as the picture shown.
17、此大行位上有小行位,开模时小行位需先退,大行位做延时,合模时则相反。 The small slider is inside the big slider, when the mold open, the small slider need to recede first and the big slider have to postpone. When the mold close, it is contrary. 18、此处需做强顶。
This position need to force ejection.
19、由于此处没有足够空间下热咀,所以需做一个柱子进胶。
This position need to make a pole for gating because there have no enough space for hot sprue. 20、沾模, stick