制衣过程风险重点控制表
部门 department 面料仓库 Fabric warehouse 仓库部 Accessory warehouse 裁床部 Cutting 车缝部 Sewing department 车缝部 Sewing department 风险重点控制 Risk control points 查验面料 Fabric inspection 查验辅料(钮扣、拉炼、缝线、挂牌及胶袋等) Accessory inspection 查验裁片 Panels checking 首件产品评估 First finishing sample evaluation 中期检查(半成品) In-line inspection 负责人员 Person in charge 相关程序文件 Documents needed 验布报告表 Fabric inspection report 辅料检查报告表 Accessory inspection report 验布员Fabric technician 仓库检查员 warehouse inspector 验片员 验片报告表 Panels inspector Panel inspection report 车缝部主管 Sewing supervisor 检查员 In-line QC 发针员 Needle distributor 检查员 Final QCs 验针员metal detector operator 检查员 inspector QC 首件产品检查评估表 First production evaluation form 中期检查报告表 Middle inspection report 车缝针/手针收发及断针记录表 Broken needle records 尾期检查报告表 Final inspection report 针检记录表 Metal detector records 终期检查报告表 final inspection report 抽样检查报告表 AQL inspection report 发针房 车缝针及手缝针的收发控Needle distributing room 制 The control of needle distributing 后整部 finishing 验针部 Metal detector department 包装部 Packing QC部 QC Dep.
100%全面检查(成品) 100% inspection 针检控制(100%产品通过验针机检查) 100% pass metal detector 包装后100%检查(成品装箱前)100%inspection 成品装箱后抽样检查(按AQL1.5或2.5标准) AQL=2.5 Inspection
因篇幅问题不能全部显示,请点此查看更多更全内容