控制桩测量(复核)记录

2024-01-24 来源:乌哈旅游
内蒙古xxxx化工有限公司2*150MW自备电厂工程

控制桩方格网测量(复核)记录

第工程名称单位工程名称内蒙古xxxx化工有限公司2×150MW自备电厂工程内蒙古xxxx化工有限公司2×150MW自备电厂工程设计坐标桩号XH08H09H11H12AH13H13H12H11H09AH084578053.9654578055.0564577737.3044577746.2844577866.2384577865.2424577865.2424577746.2844577737.3044578055.0564577866.2384578053.965Y505273.072505570.805504984.082505278.463505273.072505588.718505588.718505278.463504984.082505570.805505273.072505273.072X4578053.9654578055.0544577737.3024577746.2834577866.2354577865.2434577865.2424577746.2814577737.3034578055.0554577866.2364578053.964Y505273.072505570.802504984.081505278.46505273.07505588.715505588.718505278.465504984.082505570.803505273.075505273.075△X022131031121△Y011323020233设计1706.9421707.8641706.3891704.0561704.5461704.6981704.6981704.0561706.3891707.8641704.5461706.942测试1706.941707.8631706.3861704.0541704.5431704.6971704.6971704.0541706.3861707.8631904.5451706.94差值(mm)213231123112承包单位分包单位实测坐标差值(mm)xxx电力建设股份有限公司测量部位绝对高程备注全场方格控制网1页共仪器标定编号2页全站仪复测过程将全站仪架设在H08点然后调平,后视H13号点,准备就绪后使用坐标功能,一次测量H09,H11,H12,A点,最后读取数据,与原始数据对照则得出此点的误;同上方法再将仪器架设在H13号点,后视H08号点重新复测一遍。高程复测与上述方法一致,分别以H08与H13点为基准点来回测量。项目技术负责人测量复核测量日期2013年3月15日内蒙古xxxx化工有限公司2*150MW自备电厂工程

控制桩方格网测量(复核)记录

第工程名称单位工程名称内蒙古xxxx化工有限公司2×150MW自备电厂工程内蒙古xxxx化工有限公司2×150MW自备电厂工程承包单位分包单位xxx电力建设股份有限公司测量部位全场方格控制网1页共仪器标定编号2页全站仪

因篇幅问题不能全部显示,请点此查看更多更全内容