桥梁施工裂纹成因分析及处理措施的技术研究

2022-02-28 来源:乌哈旅游
____________市政•交通•水利工程设计Municipal - Traffic' Water Resources Engineering Design桥梁施工裂纹成因分析及处理措施的技术研究Research on Cause Analysis and Treatment Measures of Bridge Construction Cracks张路平(中国铁建港航局集团有限公司第一工程分公司,广州510000)ZHANG Lu-ping(First Engineering Branch ofChina Harbour and Channel Engineering Bureau Group Co. Ltd., Guangzhou 510000, China)【摘要】在桥梁结构施工中,裂纹是常见的问题,也是施工中比较难解决的问题。论文以新会项目为依托工程,详细介绍了施工裂

纹的分析方法和裂纹种类,并明确处理措施,保证工程实体质量。[Abstract]Cracks are common problems in bridge construction, and they are also difficult to solve. Based on Xinhui project, this paper

introduces in detail the analysis method and the types of construction cracks, and clarifies the treatment measures to ensure the quality of the

project entity.【关键词】浅表性收缩裂纹;观测;毕可法;封闭胶[Keywords ] superficial shrinkage crack; observation; never put offtill tomorrow what you can to law; sealing glue【中图分类号】U445.4

【文献标志码】A 【文章编号】1007-9467 (20⑼05-0079-02[DOI]10.13616/j.cnki.gcjsysj.2019.05.2371工程简介江门市新会区省道S217七堡大桥主桥为70m+l 10m+

凝土工程裂缝最常见问题是由于收缩变形受到约束引发的收

缩裂纹和由外部荷载作用引发荷载裂纹叫针对实体结构出现的7条裂纹,项目部指定专人进行了 7d 连续有效观测,观测过程中严格遵循“三同”(即同人、同设备、同

70m预应力混凝土连续刚构,采用2对挂篮施工,桥面横向由 一个单箱单室直腹板箱梁组成。主桥箱梁采用C55混凝土,顶

部位)原则,观澡嗷据详见表1,且每次观测均进行拍照取证。通

板宽11.3m,底板宽5.7m,两侧悬臂翼缘板长2.8m;箱梁根部 梁高为6.6m,跨中及边跨现浇段梁高为2.8m,箱梁梁高按二

过对采集观测数据的整理、讨论、分析,7条裂纹均趋于稳定,裂 纹深度以及裂纹宽度并未见延伸趋势,故判定为由于收:缩变形

次抛物线变化,H也=1/16.67,//屛=1/3928 (其中,H很为梁 端处的梁高;H由为跨中处梁高;厶为梁长);箱梁腹板厚度1*~

受到约束引发的浅表性收缩裂纹,对结构无害,属于非结构裂 纹。对于这类非结构性裂纹,裂纹的发展只存在于表面,为了防 止混凝土氯离子的渗透和滞留,需进行必要的修补和封闭处理。6*块为65cm,7*块腹板厚为55~65cm,8*~9*块腹板厚为 55cm,10*块腹板厚为45~55cm,11#~13#块腹板厚为45cm;箱 梁顶板厚28cm;箱梁底板厚度变化按照2次抛物线,由箱梁

3裂缝主要施工方法根据桥梁现有病害程度,按照国家现行相应加固技术规

根部90cm渐变到跨中30cm;边跨现浇段底板厚度由30cm渐 变到60cm,腹板厚度由45cm渐变到55cmo桥面采用2%单向

范,结合以往对类似桥梁结构工程缺陷的修补经验,对桥梁结

横坡,通过腹板高差形成。经项目内部月度质量检查时发现, 七堡大桥连续刚构混凝土表面局部出现不同程度的裂纹,裂

构混凝土裂缝缺陷采用以下修补方案。3.1对于斜向裂缝缝宽大于0.15mm,且小于或等于0.2mm,缝长小于或等

纹长度为0.4~ 1,5m不等,裂纹宽度为0.1 ~0.36mm不等。2裂纹形成原因分析混凝土是一种多孔胶凝人造石材,属刚性体,主要特点为

于1 m,采用毕可法(即恒压灌注法)进行注胶处理;缝宽大于

0.15mm,且小于等于0.2mm,缝长大于1 m,采用毕可法(即恒 压灌注法)进行注胶处理,再横向(相对于裂缝走向,以下相

抗压强度高、抗拉强度低、延伸率微小、易发生收缩裂缝叫混同)粘贴一层300g碳纤维布;缝宽大于0.2mm,采用毕可法

【作者简介】张路平(1982~),男,河北内丘人,工程师,从事公路、铁 路和市政工程管理研究。(即恒压灌注法)进行注胶处理,再横向(相对于裂缝走向,以 下相同)粘贴一层300g碳纤维布。79工程建设与设计Construction& Design For Project表1 7d裂纹观测数据分析表单位工程0.2mm以下时,底座间距约为250mm;裂缝宽

观测时间IdL=0.5m2dL=0.5m度在0.2mm以上时,底座间距为300- 350mm;原则上缝窄宜密,缝宽可稀,同时每 条裂缝至少有一个进浆孔和排气孔。(3)将灌

5d6d7d厶=0.5mL=0.5 mL=0.5m/)=0.13mm D=0.14mm 0=0.12mm Z)=0.12mm /)=0. HmmD=0」6mmD=0.14mm

22墩5*块£=lmL=imL=\\mL=\\mL=lmL=\\mL=lm0=0.2mmZ)=0.22mm D=0.22mm /)=0.21 mmZ)=0.22min0=0.18mmD=0.2mmL=1.5mL=1.5m厶=1.5mL=1.5m厶=1.5m£=1.5mL=1.5m22墩亍块£)=0.3mmD=0.32mmD=0.3mmD=0.28mmD=0.3mmD=0.3mmD=0.27mmL=lmL=lm£,= lmL=lmL=lmL=lmL=lm22墩4#块D=0.24mmD=0.22mmD=0.2mmZ)=0.23mm D=0.23mm£)=0.24mmD=0.23mm

L=0.9mL=0.9m\"0.9mL=0.9mL=0.9mL=0.9m£=0.9m22墩2*块D=0.26mmD=0.26mm £>=0.24mm Z)=0.26mm £)=0.27mm/)=0.25 mmZ)=0.26mmA=0.5m£=0.5mL=0.5mL=0.5mL=0.5mL=0.5mL=0.5m22墩4*块D=0.22mm Z)=0.24mm D=0.25mm Z)=0.24mm D=0.25mm£)=0.25 mmD=0.24mm

L=lm厶=lmL=\\m£=lmL=\\mL=lmL=lm22墩7#块P=0.25mmD=0.23mm D=0.25mm /)=0.24mm D=0.23mmZ)=0.26mmD=0.24mm1=0.15mL=0」5m厶=0.15m厶=0」5m厶=0.15m£=0.15mL=0.15m22墩7#块D=0」mm£)=0.12mm D=0」2mm D=0.11 mm/)=0.12mmD=0」2mm7)=0.10mm4d厶=0.5m3dL=0.5m胶底座按标注位置顺缝粘贴在裂缝表面,灌

胶底座之间的裂缝用封缝胶完全封闭。封缝 胶涂得太薄或太窄,均容易造成灌缝胶的泄

漏,因此,封缝胶的涂抹宽度为2~3cm,厚 1mm;涂抹封缝胶至灌胶底座处时,检查底座

是否粘接严密。为确保固化,对封缝胶至少养

护12ho (4)将灌缝胶混合均匀后,装入专用注 射器内。然后开始进行加压灌注,待达至那良值

后停止灌注。(5)裂缝较宽的地方,要先灌注

注:D为裂纹宽度;厶为裂纹长度。低黏度灌封胶,再灌注高粘度灌封胶(与低黏度灌封胶材料一

3.2对于斜向裂缝,且流白灰缝宽小于或等于0.1mm,清除白灰,采用封缝胶封缝处 理;缝宽大于0.1mm,且小于或等于0.15mm,清除白灰,采用

致),初凝后进行封口抹平。(6)灌缝完毕后,采用塑料薄膜养 护,等待灌注胶固化,固彳慌清除周边施工垃圾和废弃材料叫

4. 2修复材料裂缝封闭材料:采用色泽近似于混凝土的腻子状高分子树

毕可法(即恒压灌注法)进行注胶处理;缝宽大于0.15mm,且 小于或等于0.2m叫清除白灰,缝长小于或等于1 m,采用毕可

脂封闭。裂缝灌浆胶采用无溶剂型改性环氧树脂类灌注树脂。

法(即恒压灌注法)进行注胶处理。3.3对于竖、横向裂缝缝宽小于或等于0.2mm时,采用封缝胶封缝处理,再横向

4.3处理效果针对按照上述方案处理的7条裂纹,项目部指定专人进 行了 14d连续有效观测,观测过程中严格遵守\"三同”(即同

(相对于裂缝走向,以下相同)粘贴一层塑料薄膜养护;缝宽大

人、同设备、同部位)原则,发现所有处理后的裂纹表面均无二

于0.2mm,采用毕可法(即恒压灌注法)进行注胶处理,再横向

次折射裂纹的产生,表明裂纹的处理得到了预期的效果。(相对于裂缝走向,以下相同)粘贴一层塑料薄膜养护。4裂纹修复处理措施5结语混凝土裂纹问题是混凝土结构工程中普遍存在的一种现

4.1裂纹修复的施工工艺根据裂缝修补方案,裂缝修补分为封闭胶封闭处理和毕

象,它的出现不仅会降低建筑物的整体强度,影响建筑物的性

能,还会引起钢筋的腐蚀,降低混凝土的耐久性,影响结构物 的承载力,因此,要对混凝土裂纹进行深入研究,采用适当的 方法进处理,并在施工中采取有效措施预防裂缝的出现,确保

可法(即恒压灌注法)注胶处理。修补前,要使用酒精等有机溶剂对准备封闭裂缝处进行 清洁处理,并使混凝土表面充分干燥;将拌和好的封缝胶均匀

结构物的质量。di?【参考文献】刮涂在构件表面裂缝处,使其将裂缝完全封闭;封缝胶不涂得 太薄或太窄,封缝胶的涂抹宽度为2~3cm,厚2mm。[1】张强.桥梁高性能混凝土裂缝原因分析及预防措施[jj.江西建材,

2016(3):22-23.【2】刘卓.分析道桥工程混凝土裂缝原因及修复措施卩].城市建设理论

毕可法修补的具体步骤为:(1)用钢丝刷将裂缝周围的灰

尘,松散层等杂物清理干净,用除尘器和酒精等将裂缝处的灰 尘洗净、清除、干燥。(2)根据裂缝的宽度,确定灌胶底座的间 距和位置,在裂缝端部、裂缝交叉处和裂缝较宽处设置灌胶 嘴,贯穿裂缝须作开槽处理,而且两端埋设灌胶嘴。并用粉笔

研究,2015(20):44-46.【3】罗臣.道路桥梁施工中混凝土裂缝的原因及对策研究[J]冶金丛刊,

2017(8):28.在裂缝表面做出标记;灌胶底座的粘贴间距为:裂缝宽度在

【收稿日期12019-01-1280