工程测量技术校内实习报告
学号:181309030103
姓名:陈哲宇专业:工程测量技术
2019年8月27
1/13目录
1.实习概况................................................................................................32.实习内容................................................................................................33.技术依据................................................................................................34.技术路线................................................................................................35.工作内容................................................................................................36.技术报告................................................................................................46.1控制点布设.....................................................................................46.2水准测量.........................................................................................46.3GPS首级控制..................................................................................46.4其他测量(题目自拟)................................................................47.技术总结..................................................................................................4
2/131.实习概况
为了提高我们的测绘能力,熟练掌握各种仪器的使用,能更好的把实践和理论联系起来,学校为我们开展了为期两周的工程测量实习。我们的目的是校区控制点布设,校区水准高程测量,校区gps首级控制网的布设,全站仪的使用。主要区域是长春师范大学校区。用到的仪器有水准仪、rtk、标尺、脚架、钢尺等等。本测量高程采用国家2000高程系统2.实习内容
1、项目概况本次校内实习测区范围为长春师范大学主校区,测区面积约为55万平方米。测区以体育场、家属楼、各教学楼、图书馆、宿舍楼、行政楼、餐厅以及道路和植被绿化等构成,测区以建筑为主,测量难度适中。测量的主要任务为布设控制网,碎步测量;内业的主要任务为数据转换,误差分析和成图。2、踏勘及材料搜集踏勘:(1)测区内植被较多,观测过程中选取的控制点要视野开阔。(2)测区内有施工路段,对测量会造成一定程度的影响和干扰,要避在施工时段测量。(3)测区内极端最高气温34.6℃,极端最低气温-36.4℃,风向为西南风。(4)测区为学校人口密集,主要是7:00—8:00,9:50—10:20,11:30—13:00,14:30—15:00等几个时间段内道路上人群聚集影响正常观测。材料收集:确定已有控制点的位置以及是否可以使用,确定可用控制点的坐标数据。3.技术依据
规范:《城市测量规范》CJJ8-99;《国家基本比例尺地形图图式第一部分:1:500、1:1000、1:2000地形图图式》GB/T20257.1-2007;《1:500、1:1000、1:2000外业数字测图技术规程》GB/T14912-2005;《城市测量规范》CJJ/T8-2011;《全球定位系统(GPS)测量规范》GB/T18314-2009;《全球定位系统实时动态测量(RTK)技术规范》CH/T2009-2010《国家基本比例尺地形图分幅和编号》GB/T13989;《测绘技术设计规定》CH/T1004-2005;《1:5001:10001:2000地形图质量检验技术规程》CH/T1020;3/13《测绘成果质量检查与验收》GB/T24356-2009;《数字测绘成果质量检查与验收》GB/T18316-2008;技术依据:极坐标法4.技术路线
5.工作内容
测设GPS施工控制网点9个(含已知控制点2个);四等水准路线2.5km。测量流程图
技术设计
踏勘、选点
仪器设备检校
4/13外业观测(GPS静态观测)、
水准高程全站仪观测
观测原始记录检查
数据预处理、平差计算
整理成果资料
上交验收
6.技术报告6.1设备型号
6.2控制点布设
本标段的控制点采用平面和高程相结合的形式埋设,少部分用已有控制点,大部分用钢钉,打入地面,平面点位标识以钢钉或已有控制点顶部十字刻画中心为准,高程点位钢筋顶部为准。5/136.3水准测量
本次水准测量按四等水准精度附和线路施测,采用经鉴定合格且在有效期内南方水准仪,采用3米标准水准尺。测量数据各项限差满足《国家三、四等水准测量规范》(GB/T12898-2009)中四等水准测量精度要求。水准路线6/13起点
成果整理6.4GPS首级控制
根据测量任务的要求,结合测区实际情况,本次测量高程采用GPS拟合高程。高程控制点的布设在GPS点上,采用2000国家高程基准高程。7/136.5GPS静态控制测量
8/13基线名称基线固定情况基线固定比率单位权中误差(mm)RMS(m)HRMS(m)VRMS(m)基线X分量(m)基线Y分量(m)基线Z分量(m)基线X分量中误差(mm)基线Y分量中误差(mm)基线Z分量中误差(mm)长度(m)150-a04004固定解8.8834.8760.0120.0050.011166.079157.261-36.3531.4961.5351.544231.592150-cc01_149固定解-128.3472.480150-cc02_152固定解-102.5470.9166.0852.6033.9291.0716.2603.5034.6671.2890.0150.005362.2720.0120.006193.8380.0140.011185.671283.36249.570156.844a01001-a02002固定解17.4343.7470.0100.006-135.752209.7700.8320.9870.821293.707a01001-a03-157固定解8.6053.6310.0100.006-273.674299.5061.2241.0400.909420.268a01001-cc01_160固定解4.3517.1790.0230.010-312.820243.4981.8113.7623.531398.440a01001-cc01_140固定解15.5554.4450.0110.005-313.038243.2311.6192.3252.075398.429a01001-cc02_152固定解9.9552.4710.0090.005-439.434269.1500.6780.9880.669544.566a02002-a03-157固定解28.9083.1430.0090.006-137.91489.7420.9870.7800.714170.512a02002-cc01_140固定解12.5984.2430.0110.005-177.28833.4631.5582.2671.989265.124a02006-cc01_149_固定解87.8953.5410.0110.0050.0090.0080.0210.0100.0080.0070.0090.009154.376109.656-40.083-39.887-176.092-44.725-194.267229.18349.9479/1396.1801.2541.4011.179253.5150.0040.0070.0030.0030.0080.0070.0090.00693.095-76.584a02006-cc02_151固定解99.9002.6870.009121.9560.5960.8860.677171.479a03-157-cc01_140固定解14.8153.9750.010-56.2742.9512.2172.383164.576a04004-cc01_149固定解3.3743.1970.009-91.9621.6341.3621.846157.304a04004-cc02_152固定解99.9002.0360.007-66.1810.5590.5840.584134.008cc01_149_-cc02_151-126.52625.778cc01_149-cc02_152-126.52325.778cc01_160-cc02_152-126.63525.638实用参数设置分段最小历30元:采样间隔:解算策略:30L1/B1固定解1.222固定解1.785固定解0.96799.9001.3693.1311.88652.3471.6283.4631.1655.0672.2834.0171.570-149.563-39.36219.571126.113-116.526-0.402-136.093-136.099-136.0090.0100.005187.6020.0140.005187.6050.0100.005187.5960.0090.0130.009周跳探测方法:Kalman高度截止角:固定率:313°使用的卫星系GPS、BD、GLONASS统:解算结果基线名称:a02006-cc02_151单位权中误差:基线X分量:2.687mm93.095m基线Y分量:-76.584m基线Z分量:121.956m基线X分量0.596mm中误差:RMS:E:开始时间:0.009m-31.5382132019-09-0310:02:30基线Y分量0.886mm中误差:HRMS:N:结束时间:Azimuth:0.004m168.5525032019-09-0310:47:35100.432896d基线Z分量0.677mm中误差:VRMS:U:0.008m0.759060椭球距离:171.467m附闭合网闭合差报告
10/136.5全站仪附和导线测量
6.6RTK坐标放样
7.技术总结
本次水准高程,GPS静态观测及网平差均严格按质量保证措施实施及解算根据GPS测量规范,基线解算完成后,必须对基线解算进行质量检查,主要指标为同步环闭合差、异步环闭合差和重复基线较差,合格的基线才可以使用,不合格的基线应对其结果进行残差分析,然后重新解算,重新解算仍不合格的基线需重新测量。网平差分为约束平差和无约束平差,分别要检查基线向量改正数和基线向量改正数较差。如果严格按照2009年的GPS测量规范D级网的标准,这次实习得到的GPS网质量不是很好,同步环闭合差有明显的超限。由于普遍认为规范对同步环的要求过于严格,因此我们11/13忽略了这一项。部分异步环闭合差也有超限的,重复基线较差没有超限。删除几条基线后,剩下的异步环限差符合要求。网平差均符合要求。根据分析我们发现与a03有关的基线质量较差,可能是该点的遮挡物比较多,对卫星信号有影响。此外,我们观测期间下了一场不大不小的雨,可能也对观测形成了一定的干扰。在内业处理时,我们采用的南方sgo比较简单,无法做复杂的基线处理,因此很多误差难以消除。以后在做静态测量时,应该在选点时更加注意周边环境条件。同时在内业处理时使用功能更加全面的软件,以便对基线进行更为细致的处理。关于对实习的意见和建议,首先我觉得测量过程中水准并未完全符合规范,导致后期数据有较大出入。实习照片
12/1313/13